Electric Pilot System V5
© Blichmann Engineering, LLC 2019
3
Attach the elbow to the AutoSparge™ output with PTFE tape. Refer to the
AutoSparge™ manual for installation instructions. Attach the Flow Meter to
the elbow with PTFE tape.
Attach the three way valve to each outlet of the RipTide™ pumps with PTFE tape.
(Figure AC)
Flow Meter
Elbow
Flow Meter
Figure AC
Three Way Valve
Step 1:
Step 2:
Step 3:
Step 4:
Mount the RipTide™ to the table with the 1/4-20
hardware. Make sure the pump head is facing to the left and the cord is on the right.
Remove the grommet and slide the RipTide™ cable through the grommet and hole. Reinstall the grommet.
Plug into the receptacle of the nearest BrewCommander™.
Plug the 6ft 120v extension cable from the BrewCommander™
120v cable (shown in Figure A) to the outlet on the bottom of the
table.
If using the 1BBL with Dual Element Controllers Connect the
RipTide™ cables into the outlet on the bottom of the table.
Installing the RipTide™ Pumps
Backside of the BrewCommander™ Controller
Summary of Contents for 1BBL
Page 8: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 8 ...
Page 9: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 9 ...
Page 10: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 10 ...
Page 12: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 12 ...
Page 13: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 13 ...
Page 14: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 14 ...
Page 16: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 16 ...
Page 17: ...Electric Pilot System V5 Blichmann Engineering LLC 2019 17 ...