background image

 
 

19

Important!

 During dough-in always turn the pump OFF or you will airlock your pump and stick your mash. 

It is important for the water to absorb and the air to purge from the grains.  10 min is usually adequate. 

 

(11)

 

After dough-in, turn the valves back on, turn on the pump, and place the controller back to 

AUTO and the burner will ignite as needed. 

(12)

 

To ramp to another temperature simple use the up arrow and press enter to accept. The burner 

will ignite accordingly. 

 

Tip!

 Wort samples to monitor starch conversion and specific gravity are easy – just open the sample port valve 

and draw off a sample! 

 

(13)

 

When your mash is done (usually at 168F (75.5 C)) you may begin the sparge process. 

 

Caution!

 During sparging ALWAYS put BOTH controllers into RESET and turn the gas off!  Failure to do so 

could result in a warped/damaged HLT or mash tun! 
 

(14)

 

If you are using the Blichmann Engineering

tm

 Tower with an AutoSparge

tm

, simply rotate the 3-

way valve toward your boil kettle hose and then open your HLT valve.  You may use the 3-way valve to 

throttle your lauter rate which can be read on the flow meter.  The AutoSparge will automatically 
adjust to the lauter rate into your boil kettle if you are using this option.  Again, putting the pump 
selector switch in the “Silence” position will turn off the alarm horn but leave the pump running. 

 

 
Cleaning 

 
Always clean your system immediately after use to flush wort out of the hoses, pump and other cavities.  
While wort making equipment does not need to be sanitized, it DOES need to be clean.  We recommend 

recirculating PBW (Powdered Brewery Wash) and then StarSan through your system immediately after each 
use. 
 

Simply use a bottling bucket filled with PBW, elevate it above your pump, and connect with a hose to the inlet 
of the pump.  Place the outlet hose (return hose to your mash tun) in the top of the bucket.  Open the valves 

and start the pump.  If using the Tower, opening the sample port will vent air out of your pump.  Run for 
about 15 min, drain, and then repeat with StarSan, then drain and allow to dry

.

  Periodically, you may wish 

to remove the pump head and disassemble for cleaning.  Refer to the March manual for instructions.

 

 

 
Advanced Operation Mode (auto ramp/soak/monitoring) 

 

This mode of operation requires the purchase of an optional RS485->USB communication cable (purchase 
through your retailer) and downloading the free Blichmann Engineering TOP-Link interface software from our 

web page.  Please note that a plain USB cable will not work and may damage the controller.   
 
www.blichmannengineering.com/TOWER_of_POWER/TOWER_of_POWER.html   

 
If you are not comfortable with using computers and/or do not like experimenting or tinkering with your 
system this is probably not a feature you should explore.  In any case, we highly recommend that you master 

operating the product in manual mode first before attempting to operate in auto ramp/soak mode.   
 

Important:

 This is an advanced feature and phone/tech support is not provided through Blichmann 

Engineering

tm

.  If you do have questions or trouble please contact your retailer for assistance.  We highly 

recommend that you review the online video PRIOR to purchasing the cable. 

 

Summary of Contents for TOWER of POWER

Page 1: ...ead and understood these instructions Caution Sections labeled Caution can lead to equipment damage or unsatisfactory performance of the equipment Please read these sections thoroughly If you have any questions contact your retailer or Blichmann Engineering www BlichmannEngineering com before use Important Sections labeled Important are critical to the proper performance and life of the product Se...

Page 2: ...ey can purchase the Tower module that provides all the needed plumbing and provides a convenient stand for the control module s If you already own a March 809 815 pump you can purchase the Tower without the pump Note the hoses that connect from the Tower to the pots are not included If you are a TopTiertm owner an optional mounting kit is available to mount it permanently to the stand Controller M...

Page 3: ... Flow GPM LPM 5 19 0 5 2 8 10 38 0 75 3 8 15 57 1 25 4 75 20 76 1 5 5 7 32 121 2 25 8 5 Important Grain bed flow rates are highly dependent on crush quality Move to a coarser crush if you are not able to flow at the above rates It is also recommended that you allow a 10 min dough in prior to turning on the pump to allow the air to purge from the grain and for the grain to fully absorb the water Bu...

Page 4: ...itions above with your system that is OK but it must be expected that stability and control will be compromised Note A slight overshoot of the recirculation temperature is normal and will NOT harm your enzymes Enzymes are denatured over a period of time not instantaneously We have tuned this system to offer the best match of ramp speed and stability The chart below shows a typical response curve f...

Page 5: ...out sticking your mash Note that rice hulls can aid in increasing recirculation rates Assembly The TOWER of POWERtm Modular Brewing Control ships partially assembled to allow it to be shipped more economically via ground carriers and to protect it from shipping damage Parts List The following items are shipped with the product Please check to verify that you received all the parts Contact your RET...

Page 6: ...mp March 815 if ordered with Tower Optional Dual Controller Mounting Plate reqd for mounting two controllers onto the tower 1 Plate model aCon_plate_TOP 4 10 24 X 3 8 long pan head screws Assembling the Tower Prepare a work area with a soft pad to protect the tower enclosure from getting scratched during assembly WARNING Make sure that the tower is NOT plugged in until you have fully completed the...

Page 7: ...ump head to so that the inlet faces down and the outlet faces up flow arrow faces up Simply remove the 4 mounting screws rotate the head and reinstall the pump head Consult the March manual if needed To wire the pump insert the pump lead wire through the rubber grommet in the back of the enclosure and feed it out the bottom of the enclosure Fig 6 Fig 3 Fig 4 Fig 5 Fig 6 Drip Shield Fig 7 Fig 8 Pla...

Page 8: ...s that are labeled pump power and connect them to the matching color leads on the pump lead using the wire nuts as shown in Fig 8 Then push the remaining wire up into the bottom of the tower Install the pump hose between the pump and the bottom of the flow meter as shown in Fig 9 Install the 90 degree QuickConnector onto the bottom of the pump Fig 10 Install the 3 8 90 degree QuickConnector onto t...

Page 9: ...wn in Fig 13 using the outer most 4 screw holes Then use an additional 4 screws to mount the assembly onto the tower as shown in Fig 12 using the inner 4 screw holes and placing the screws through the mating holes in the angle brackets on the top of the Tower Plug each controller into the GFCI receptacle on the back of the tower WARNING Make sure that the tower is NOT plugged in until you have ful...

Page 10: ...at or moisture If it is warm to the touch it is too close to heat source NEVER HEAT COOKING OIL WITH THIS EQUIPMENT NEVER operate on soft combustible or uneven surfaces like dirt gravel wood or asphalt NEVER operate indoors in a garage under an overhang porch deck carport or similar structure NEVER use near and combustible chemicals gasoline or other flammable vapors or liquids NEVER Bypass the GF...

Page 11: ... or gas valve off at the source when not in use Fig 16 and 17 show typical installations Important The brass orifice fitting small hole through it supplied with your burner must ALWAYS be installed directly on the burner casting Do NOT install this fitting on the inlet to the regulator or your burner will not function properly Install the ignition electrode The ignition electrode is used to create...

Page 12: ...are not to crack the insulator Cracked electrodes are not covered under warranty Trim the wire using a wire cutter to the length noted previously Install the electrode and note the position of tip of the wire with respect to the surface of the burner Trim as needed to provide a 3 16 1 4 gap It is OK to bend the wire a bit as needed to center the tip of the electrode Fig 18 and 19 show typical inst...

Page 13: ...emale NPT fitting place the o ring washer and adapter bushing onto the sensor as shown in Fig 22 Place 4 5 turns of quality Teflon tape not included to the external NPT threads of the bushing Do not use tape on the sensor threads Then thread the assembly into the fitting Caution Once installed the bushing CANNOT be removed DO NOT over tighten Use a wrench to tighten the sensor and thread it into t...

Page 14: ...r mash tun to the inlet of the pump Install a flow control valve after the pump Then plumb through the sensor and lastly back to the TOP of the mash bed Note it is also acceptable to switch the order of the flow control valve and the sensor Installing the sensor in your own system locate the sensor according to the schematic in Fig 25 A close up of the sensor installed in a pipe T not included but...

Page 15: ...this power will cause permanent damage to the ignition system and is not covered under warranty Never exceed 30 PSI on the solenoid valve Warning The ignition system uses high voltage to create a spark Do not power up the controller and leave the selector switch in Reset mode until connections of the ground and ignition wires are made or shock could occur ALWAYS place the black vinyl cover over th...

Page 16: ...ning If you are unable to ignite after 10 sec turn the selector switch to RESET immediately This will deactivate the gas valve and ignition sequence Check fuel tank level and that all gas valves and regulators are on Check that the solenoid valve is installed in the correct direction and that the ignition and ground wires are properly installed At this time you can return the selector switch back ...

Page 17: ... the flow meter is equipped with a low flow switch and alarm horn that will notify you in advance that your flow is dropping and your mash is beginning to stick Simply slide the switch assembly up or down to the desired low flow setting Important It is possible for bits of grain to become lodged in the valve or in the flow meter This may give a false indication that the mash is sticking Simply ope...

Page 18: ...djust the flow to your desired setting using the handle on the 3 way valve or your flow control valve to throttle it back if needed NEVER throttle the flow to the INLET of the pump ALWAYS on the OUTLET of the pump 5 Place all controller mode selector switches to RESET 6 Turn on the controllers and enter the desired strike water and HLT temperature into the controller 7 Place both controllers in AU...

Page 19: ... need to be sanitized it DOES need to be clean We recommend recirculating PBW Powdered Brewery Wash and then StarSan through your system immediately after each use Simply use a bottling bucket filled with PBW elevate it above your pump and connect with a hose to the inlet of the pump Place the outlet hose return hose to your mash tun in the top of the bucket Open the valves and start the pump If u...

Page 20: ...ons and your fastest way to resolve your issues if the chart below does not resolve your problem Your retailer will contact Blichmann Engineering if they are unable to resolve your issues Display flashing Press enter key to accept temperature setting If flashing does not stop cycle power on front of controller If this recurs contact your retailer Overshoot Increase flow and or decrease heat input ...

Page 21: ... are open Check that mash is not stuck compacted See below Check that all hoses downstream of the pump are empty Install a bleed valve after the pump to vent air and allow the pump to fill with liquid For Tower users the sample port can be used Mash is sticking Reduce flow rate Ensure you have done a dough in WITHOUT the pump on to allow air to purge from the grain bed Check that grain crush is no...

Page 22: ... will be the responsibility of the customer Resolution of warranty claims will be by repair or replacement and will be the decision solely of Blichmann Engineeringtm Shipping costs for warrantee returns are covered only for the contiguous United States User is responsible for packaging costs and shipping damage if not returned in original packing Approval for return must be provided by Blichmann E...

Reviews: