9
Installing Single Control Module On The Tower
Using 4 #10 X 3/8” screws install the control module as shown in Fig 12
installing the screws through the through the mating holes in the angle
brackets on the top of the Tower.
TIP!
Using a long Phillips screwdriver or a ratcheting or 90 deg screwdriver
makes accessing the front two screws easier.
Plug the controller into the GFCI receptacle on the back of the tower.
Installing Dual Control Module Onto The Tower
Using 4 #10 X 3/8” screws install each control module onto the adapter
plate as shown in Fig 13 using the outer most 4 screw holes. Then use an
additional 4 screws to mount the assembly onto the tower as shown in Fig
12 using the inner 4 screw holes and placing the screws through the
mating holes in the angle brackets on the top of the Tower.
Plug each controller into the GFCI receptacle on the back of the tower.
WARNING!
–
Make sure that the tower is NOT plugged in until you have fully connected the ignition and
ground wires or electric shock could occur from the ignition wire!
NOTE:
An optional mounting kit is available for installing the TOWER of POWER
tm
onto the TopTier
tm
modular brewing stand as shown in Fig 14.
That completes the assembly of the tower and control modules!
Screws
Long
Screw
Driver
Fig 12
Fig 13
Fig 14