•
The air will be concentrated in cooling system if the charger is not used for a pe -
riod.
•
•
If you observe that the customer has not used it for a long time, please pay spe -
cial attention.
•
Pump must not be operated without coolant ; level of coolant should be keep in
100mm(3.94”)~150mm(5.91”).
•
Please carry the following inspection at specified interval for liquid cooled
charging cable system
A. Recommended maintenance interval every 3 months or as needed Connector:
• Visual inspection for defects or damage.
• Check cover for scratches.
• When exchanging the cover, check for mechanical damages.
• Check the screws for secure fastening.
• Clean the outside of the connector with damp cloth.
• Clean the outside of the connector with a wet cotton towel.
Max.150mm(5.91”)
Min.100mm(3.94”)
Note: Considering the different environmental conditions, we recommend the
minimum height greater than 130mm.
56
56
semaconnect.com