background image

picture 92:please connects the 
ignitor according to the manul

Installation is finished

19

20

Summary of Contents for MIG-29

Page 1: ...used by the improper use of this model Instruction Manual Twin 70MM EDF HEAD OFFICE HTTP www lxhm us ADD 4th floor F2 Chaohui Building No 180 Huating Road Shuiwei Village Dalang Street Bao an District...

Page 2: ...motor ile the motor is running it can lead to 9 Do not touch the propeller wh model will not take any responsibility for damage or accident caused by the improper use of this SHENZHEN LANXIANG MODEL A...

Page 3: ...rachute Coloured smoke Cockpit ejection 0 360 vector vents 3 4 Description The kits include length 1514mm 60 9 CH Radio Control wingspan 1142mm 45 2 x 50A Brushless ESC EDF diameter 2 70mm 17 9gram se...

Page 4: ...88 Vertical Tail Installation 62 67 Smoke Launchers Installation 89 92 Beautification 89 92 Parachute Bolt Installation 31 Wings Installation 68 77 Hood Installation 78 79 Pilot Parachute and Cockpit...

Page 5: ...Picture 3 a Servo with 250mm Wire is Required for Pilot Ejection Function Two 1100mm Servos and one 1000mm Servo are Required for Vector Thrust 7 8...

Page 6: ...th 1000mm wire Parachute Servo with 1000mm wire Vertical Fin Connecting Wire Retracts Connecting Wire Flaps Connecting Wire Color Smoke Connecting Wire and Aileron Connecting Wire Flap servo s Y wire...

Page 7: ...11 12...

Page 8: ...13 14...

Page 9: ...15 16...

Page 10: ...17 18...

Page 11: ...picture 92 please connects the ignitor according to the manul Installation is finished 19 20...

Page 12: ...er Steps 1 receiver connects 2 Coloured smoke connects make sure LED light is out before coloured smoke connection Coloured smoke connection ON ON Installation of colored smoke ignitor ON ON ON ON ON...

Reviews: