Installation
5
Owner’s Responsibilities
1. Oven(s) are uncrated, stacked (if applies) and
put in place.
NOTE: Please refer to Leg Attachment and
Stacking Addendum.
2. The owner/operator must have the following
plumbing and electrical requirements met and
installed.
NOTE: Refer to the Utility Connection infor-
mation provided.
WARNING!!
Improper installation, adjustment, alter-
ation service or maintenance can cause
property damage, injury or death. Read
the installation, operation and mainte-
nance instructions thoroughly before
installing or servicing this equipment.
PLUMBING
Water
Water Pressure (min/max)
40 PSI min / 50 PSI max
Cold Water Connection
3/4” Hose Fitting, 3/8” ID hose minimum
Water Regulator Setting
35 PSI static
Drainage
Atmospheric Vented Drain
Drain Connection
2” Copper
Avg Water Drain Temp.
Approximately 122
_
F / 50
_
C
ELECTRICAL
COS-6
COS-101
COS-101S
Electrical
9.4 kw
18.5 kw
18.5 kw
Amp/line (max)
Amp/line (max)
Amp/line (max)
Volt
3
Phase
1
Phase
Volt
3
Phase
1
Phase
Volt
3
Phase
1
Phase
208
26
45
208
52
89
208
52
89
240
23
40
240
45
77
240
45
77
480
23
N/A
480
23
N/A
By
M d
Steam
9kw
18kw
18kw
y
Mode
Hot Air
9kw
18kw
18kw
Combi
9kw
18kw
18kw
Blower Motor
.33 HP / .4 kW
.5 HP / .5 kW
.5 HP / .5 kW