Installation
8
Utility Connection
GAS CONNECTION (if applicable)
Connect the oven to the gas line with the proper
type of gas according to Local and National Instal-
lation Standards.
Setting Equipment for Other Types of Gas
1. Shut off the gas valve and turn off the operat-
ing switch.
2. Dismantle the gas block by means of cou-
plings.
3. Dismantle the burner and replace the injec-
tors.
4. Install the burner and gas block.
5. Check for leakage and possible loose electri-
cal connections.
6. Adjust gas pressure if necessary, See figure.
INLET PRESSURE TAP
NOTE: Zephaire-G/DFG-50 units only. See figure
for pressure tap location.
1. Remove the blue pipe cap from the gas inlet
pipe.
2. Apply thread sealer to the male pipe threads.
3. Thread the inlet pressure tap assembly onto
the gas pipe and tighten.
4. Check for leaks.
Pressure Tap
DFG-50
Gas Pressure
Adjustment
Pressure Tap
Back of Oven All Units
Gas
Connection
Pressure
Tap
DFG-100 and Zephaire-G
Manifold
Pressure
Tap
AC-500
Manifold
Figure 11
Summary of Contents for DFG-100 Series
Page 2: ......
Page 4: ......
Page 5: ...2 Installation and Operation Manual for Export Series Gas and Electric Convection Ovens ...
Page 25: ...22 Installations og Betjeningsvejledning til Gas og El konvektorovne Eksportmodeller ...
Page 45: ...42 Installatie en Gebruikshandleiding voor Gas en Elektrische Convectieovens Exportserie ...
Page 105: ...102 Manuale d Uso e di Installazione per Forni Termoventilati a Gas ed Elettrici Serie Export ...
Page 165: ...162 Handledning för Installation och Drift Exportserien Gas och Elektriska Konvektionsugnar ...