06
20180108/TT/K8/Version 1.0
3 Uncover the front cover.
a.
Facing the front cover,
pull the front cover
towards < 15deg.
b.
Pull the front cover
upwards
4 Select the opening side
(LEFT
/
RIGHT)
according to installation
requirement at site.
Break the 3 openings and
insert the speed fit
connectors in order:
a.
Filter water
(1/4”)
b.
Flush water (1/2”)
c.
Inlet (1/2”)
5 Connect tubing & fittings.
a.
Connect tubing &
fittings
to
the
inlet/outlet of the
UF/GAC according to
indication.
b.
Flush UF for at least 3
min prior connecting
to the GAC & ensure
no whitish found in
the water otherwise
to continue flushing.
c.
Connect UF outlet
(side) to the GAC inlet.
d.
Flush GAC for at least
3 min & ensure no
b
a
<15 deg
b
a
c
Right Opening
UF
GAC
1/2”
Connector
UF
1/4”
Connector
GAC
Left Opening