07
20180108/TT/K8/Version 1.0
dark ash found in the
water otherwise to
continue flushing.
e.
Connect GAC outlet
and UF outlets to the
side connectors.
f.
Insert tubing fully
into
the
speedfit
follow by the lock pin
insertion as indicated.
6 Connect pressure gauge
to ”T” speedfit connect
or
according
to
the
indication.
7 Assemble front cover to
back cover
a.
Insert front cover ribs
to the back cover
slottings at <15deg
tilt.
b.
Apply mild force at
front cover top to lock
the ribs to the back
cover slot.
c.
Push
front
cover
towards the back
cover.
8 Assemble batteries.
a.
Unfasten 4 screws as
indicated to remove
the PCB protector.
b.
Insert 1pc button cell
CR2032 to the PCB as
indicated with care.
f
c
a
b
<15 deg
a
b
1pc CR2032
button cell
2pcs AA
batteries