2017-12
1 866 907 0122 blubathworks.com
1
Attention — Before Installation
If you are installing this product in a new construction or remodel, please make sure you are following all local plumbing and
building codes. Carefully unpack and examine your new fixture for damage. To help insure that the installation process will
proceed smoothly and correctly, please read these instructions carefully before you begin.
- We recommend that the installation be done by a minimum of 2 people as a security precaution. Also make sure
to adopt the proper posture when lifting the basin.
- Adhere to all local building and plumbing codes. The diagrams in this guide are not construction plans. They are visual aids.
1. Inspect this product to ensure you have all parts as shown that are required for proper installation. Blu recommends that the
installer refer to the
Geberit toilet system installation and maintenance instructions.
2. Read this entire instruction sheet to ensure proper installation.
3. Compliance and conformity to local building codes and ordinances is the responsibility of the installer.
4. Compliance and conformity to local fire codes and ordinances is the responsibility of the installer.
5. Purge all the water supply lines before making connections.
Installation Requirements
Please read the instructions carefully so as to avoid any damage to the fixture.
1. To ensure this product is installed properly, you must read and follow these guidelines.
2. The owner/user of the product must keep this information for future reference.
3. Consult local building codes to make sure the installation complies with standards.
4. Remove the unit from its packaging. Before disposing of it, inspect the unit to make sure its in good shape. Should inspection
reveal any damage or defect in the finish, contact your distributor. The warranty does not cover damages or defects in the finish
once it has been installed. Blu Bathworks’ responsibility for shipping damages ceases upon delivery of the product in good
order to the carrier. All complaints regarding damage due to transport must be made directly to the carrier.
5. Place the unit in the bathroom before you start working. Conserve all nuts and bolts.
6. To protect the unit during installation, we recommend that you lay a piece of cardboard on the bottom.
7. If the unit is covered with polyethylene protective film, do not remove until installation is complete to grant maximum protection.
However, remove film where any two surfaces will be in permanent contact.
8. Verify that all dimensions on the plan are the same as the ones of the unit.
9. For use on installations with vertical discharge only. DO NOT CUT DISCHARGE PIPE.
10. 3" DWV vertical waste line connection.
11. Water supply will be ½
"
copper, recommended water pressure from 25 PSI to 90 PSI.
12. Materials suitable for wall construction include Gypsum-green board, cement board, or tile backer board.
Wall thickness not to exceed 2
"
.
13. When installing remote actuator, use of access panel kit Geberit 461.043.00.1 or 115.767.11.1 is recommended.
14. When mounting bowl on tile or marble, use of a tile cushion pad Geberit 156.055.00.1 is recommended.
15. All installations must conform to local and national plumbing, building and fire codes.
16. Inspect this product to assure you have all parts required for proper installation.
17. Do NOT use putty during this installation.