Manual
Roboost Roof Tiles Landscape
PREPARATION
Required tools:
•
•
Tape measure
•
•
Angle grinder
•
•
Hex key, 5mm
•
•
Open-end wrench 13mm
1. Check that the roof subsurface is sufficiently strong (replace if necessary).
2. Observe the NEN standards at all times.
! OBSERVE THE APPLICABLE OCCUPATIONAL HEALTH ANDSAFETY REGULATIONS AT ALL TIMES
ROOF HOOK
Install the roof hooks by spacing them according to the results of the
Blubase calculation tool.
Take into account that the mounting profile should not extend more
than 200mm beyond the outermost roof hook and that the distance
between the solar panels and the roof edge should be 500mm at all
times.
STEP 1
Adjust the gap between the lower and middle part of the roof hook in
such a way that the roof hook clamps lightly when pushed over the roof
tile and roofing batten.
STEP 2
We advise the use of an angle grinder to create space for the roof hook
in the underlying roof tile. This ensures that the roof tiles still fit neatly
together.
2
Blubase
|
Lingenstraat 9
|
8028 PM Zwolle, Nederland
|
T. (+31) 085-8000 501
|
info@blubase.nl
|
www.blubase.com