Manual
Roboost Roof Tiles Landscape
Press the end clamp tightly against the panel.
The end clamp is positioned correctly if it rests against both the panel and
the mounting profile.
Place the second panel on top of the mounting profiles.
STEP
10
Install an intermediate clamp in between the panels. Press the panels tightly
against the intermediate clamp.
Caution! The tightening torque of the screw connection is 9 Nm.
STEP
11
All panels are clamped at four points.
STEP
9.5
5
Blubase
|
Lingenstraat 9
|
8028 PM Zwolle, Nederland
|
T. (+31) 085-8000 501
|
info@blubase.nl
|
www.blubase.com