5-17
R O U T I N E O P E R A T I O N
R O U T I N E O P E R A T I O N
To charge the batteries, open the charge port door, remove dust covers (if using the J1772 paddle, the dust cover over the lower unused
section of the charger port can remain in place) and insert the paddle into the charge port. Once inserted properly a “click” can be heard
indicating a good connection and the initiation of the charging process. When connected properly and charging, the instrument cluster will
display
“Charger Connected”
in Area 5 of the message display center in the instrument panel.
There are two charging modes that can be displayed:
“Charger Connected” or “Charging Error”.
When the ignition is in the OFF position,
press any of the three buttons next to the message center to display the charging status. The display will remain ON for 10 seconds and then
time out. If the ignition is ON the charging status will display automatically. While charging, Area 3 in the message center will display “
Time
To Full Charge
” indicating the time needed to complete a full charge.
When your bus is not in use for short periods of time (less than 7
days) it should be plugged into the battery charger (See
NOTE
on next
page regarding charging when bus is idle for more than 7 days). This can
be particularly important in hot and cold environments. The batteries
will not begin to charge until they are the proper temperature. When
you plug the battery charger into the bus, the computer checks the
battery temperature and either cools or heats the batteries using the
power from the charger. When the batteries are at proper temperature,
the charging cycle will automatically begin.
NOTE:
the “
Time To Full Charge
” indicated on the instrument cluster reflects the
total
time, including the time it takes to heat or cool the
batteries. The LEDs on the shifter will stay illuminated until the charging process is complete. While the shifter LEDs are still lit, the bus will
be inoperable.
3011.9
Mi
13.3 V
Charger
Connected
12:25 AM
45
Mi
to Empty
Time to Full
Charge:
4.7 hrs
Summary of Contents for Vision 2021
Page 2: ......
Page 64: ...2 52 D R I V E R S H A N D B O O K ...
Page 80: ...3 16 D R I V E R S H A N D B O O K ...
Page 116: ...5 24 D R I V E R S H A N D B O O K ...
Page 119: ...6 3 P R E T R I P I N S P E C T I O N P R E T R I P I N S P E C T I O N ...
Page 135: ...6 19 P R E T R I P I N S P E C T I O N P R E T R I P I N S P E C T I O N ...
Page 136: ...6 20 D R I V E R S H A N D B O O K ...
Page 152: ...8 6 D R I V E R S H A N D B O O K ...
Page 168: ...9 16 D R I V E R S H A N D B O O K ...
Page 201: ...1 Notes ...
Page 202: ...2 D R I V E R S H A N D B O O K Notes ...
Page 203: ...3 Notes ...
Page 204: ...4 D R I V E R S H A N D B O O K Notes ...
Page 205: ...5 Notes ...
Page 206: ...6 D R I V E R S H A N D B O O K Notes ...
Page 207: ...7 Notes ...
Page 208: ...8 D R I V E R S H A N D B O O K Notes ...
Page 209: ......