ProxySG 900 Series Maintenance & Upgrade Guide
87
Slide Rail Kit
This section describes how to install the slide rail kit for the ProxySG 900 series into a variety
of equipment racks.
Pre-Installation Checklist
Item
Description
Tools
#2 Phillips head screwdriver
8mm wrench (or an adjustable wrench)
Equipment rack specific mounting hardware (refer to your equipment rack guide for more
information)
Marker Pen (optional)
Mechanical lift (optional)
Components Supplied
Slide Rail Kit, consisting of the following components:
(2) Pre-assembled slide rails (each Rail_A assembly has the inner rail preinstalled)
(2) Rail_C bracket
(4) Rail_D bracket
Hardware pack
■
(10) M3 T-Type
■
(8) M6 screw
■
(8) M6 cage nut
Safety Notices
●
See “Safety Warnings and Cautions” on page 8.
●
The Blue Coat ProxySG 900 series appliances are heavy and require at least (1)
additional
person to assist the technician during final installation, if a mechanical lift is
not used.
Summary of Contents for ProxySG SG900-10
Page 6: ...6 ProxySG 900 Series Maintenance Upgrade Guide...
Page 28: ...About This Guide 28 ProxySG 900 Series Maintenance Upgrade Guide...
Page 34: ...34 ProxySG 900 Series Maintenance Upgrade Guide Fan Assembly...
Page 56: ...56 ProxySG 900 Series Maintenance Upgrade Guide Memory Module...
Page 86: ...86 ProxySG 900 Series Maintenance Upgrade Guide BIOS Battery...
Page 103: ......
Page 104: ...www bluecoat com...