4
2
Installation
©
Moffat Ltd, January 2007
Revision 1/
Blue Seal Evolution Series Electric Salamander
Clearances
This unit must be installed on a non-combustible wall or tailored stand with the following clearances:-
Wall Mounting (to non-combustible wall only)
NOTE: Only non-combustible materials can be used in close proximity to this appliance.
1.
Fix the wall mounting bracket to the wall
with six screws, in such a position that the
top of the bracket is level and at least 945
mm (38”) above any surface beneath the
unit. This will ensure that the bottom of the
Salamander is at least 600 mm (24”) above
any surface.
2.
Fit the two black plastic spacers to the top
rear corners of the unit.
Leave them
unscrewed by approximately 5 mm.
3.
Fit the two adjusting screws / bolts into the
nutserts at the bottom rear corners of the
unit. These should protrude approximately
30 mm from the rear of the Salamander.
4.
Lift the Salamander onto the wall bracket,
lining up the black plastic spacers on the
salamander with the mounting notches in the
bracket.
5.
Lower the Salamander onto the mounting bracket.
6.
Tighten the black spacers securely and adjust the
levelling screws/bolts to ensure that the unit is level.
~ 5mm
~30mm
Combustible Surface
Non-Combustible Surface
Left/Right hand side
50mm
0mm
Rear
50mm
0mm
Top Clearance to;
Extraction Hood
200mm
Ceiling (subject to all local regulation requirements)
300mm