3
Specifications
Model Numbers covered in this Specification
G55T Gas Griddle Toaster
General
A commercial heavy-duty gas fired griddle toaster, having two tubular burners heating a griddle plate
from underneath and providing toasting heat for the toasting rack below.
Burners are operated by individual control valves and are provided with a piezo ignition permanent
pilot incorporating a thermocouple flame failure control.
Optional Accessories
This appliance can be fitted with the following optional accessories, (refer to 'Replacement Parts List'
for details).
Plinth Kit.
Gas Supply Requirements
- Australia / New Zealand Only:
- UK Only:
NOTE:
* - Measure burner operating pressure at manifold test point with both burners operating at full
setting. Operating pressure is ex-factory set, through appliance regulator and is not to be
adjusted, apart from when converting between gases, if required. (Refer to ‘Gas Conversion’
section for details).
Gas Connection
Gas supply connection point is located 130mm from right hand side of appliance, 32mm from rear,
655mm from floor and is entered from beneath appliance. An optional underside connection is
available.
Connection is ½ BSP male.
Natural Gas
LP Gas (Propane)
Input Rating (N.H.G.C.)
42 MJ/hr
(39,800 Btu/hr)
Supply Pressure
1.13 - 3.40
kPa
(4.5” - 13.5” w.c.)
2.75 - 4.50 kPa
(11” - 18” w.c.)
Operating Pressure
1.0 kPa (*)
(4.0” w.c.)
2.5 kPa (*)
(10.0” w.c.)
Gas Connection
1
/
2
” BSP Male
42 MJ/hr
(39,800 Btu/hr)
Natural Gas (G20)
Propane (G31)
Heat Input (nett)
Nominal
11.0 kW
11.0 kW
Reduced
6.0 kW
5.6 kW
Gas Rate (nett)
Nominal
1.16 m
3
/hr
0.85 kg/hr
Reduced
0.63 m
3
/hr
0.44 kg/hr
Supply Pressure
20 mbar
37 mbar
Burner Operating Pressure
10 mbar (*)
26 mbar (*)
1
/
2
” BSP Male
Gas Connection
Summary of Contents for Evolution G55T
Page 20: ......