Blue Sky Network, LLC
February 2018
HE100A Install Guide
12
Version 1.5
POWER WIRING
To assure that the HE100A will operate properly down to its rated minimum input voltage, ensure that
power wires of at least the recommended size are connected in accordance with the installation drawings.
It is recommended that power and ground wires are a twisted pair to reduce signal noise.
GROUND BONDING
In order to assure installation characteristics match the DO-160 RF and Lightning test conditions, ensure
that ground wires of at least the recommended size are installed and these wires are connected to a
bonded aircraft ground.
CABLE & WIRE HARNESS ROUTING CONSIDERATIONS
•
The length and routing of cables must be carefully planned before starting the installation.
•
Avoid sharp bends in the cable.
•
Do not locate the cable near aircraft controls.
•
Observe all appropriate sections of FAR Parts 23, 25, 27, and 29, as well as AC43.13-1B and AC
43.13-2A. Damage caused by improper installation will void product warranty.
•
In order to ensure optimum performance, the HE100A and associated wiring should be kept a
minimum of three feet from high noise sources and not routed with cables from high power
sources.