D1000C IRIDIUM SATCOM DATA SOLUTION
Page
19
D1000C
I
NSTALLATION
The location of the D1000C is at the option of the installer, but consideration should
be given to environmental conditions and distance from the antenna.
G
ROUND
T
EST
& O
PERATIONAL
F
LIGHT
C
HECK
P
ROCEDURE
A functional ground test procedure and an operational flight check procedure should
be used to verify proper installation and functional performance. Please check the
section “System Performance Verification” on page 21 for further test details.
The required logbook entries and FAA approvals are the responsibility of the
installer and Blue Sky Network assumes no responsibility for either obligation
.
If any difficulty is experienced with the functionality or operational performance of the
D1000C, contact Blue Sky Network for assistance.
M
AINTENANCE
Aircraft Annual Inspection Considerations
During the aircraft annual inspection:
•
Visually inspect the antenna installation for loose fasteners or corrosion
•
Perform a functional check of the system by transmitting and receiving
data (such as making an internet inquiry).