Ground Test & Operational Flight Check Procedure
A functional ground test procedure and an operational flight check procedure should
be used to verify proper installation and functional performance.
The required logbook entries and FAA approvals are the responsibility of the
installer and Blue Sky Network assumes no responsibility for either obligation
.
If any difficulty is experienced with the functionality or operational performance of the
C-1000A, contact Blue Sky Network for assistance.
Maintenance
Aircraft Annual Inspection Considerations
During the aircraft annual inspection:
•
Visually inspect the antenna installation for loose fasteners or corrosion
•
Perform a functional check of the system by making a telephone call
C-1000A Modem Unit
The C-1000A Modem Unit requires no scheduled maintenance or routine servicing.
The installation has no additional overhaul time limitations.
C-1000A Cabin Unit
The C-1000A Cabin Unit requires no scheduled maintenance or routine servicing.
The installation has no additional overhaul time limitations.
Summary of Contents for Iridium C-1000A
Page 37: ...December 2006 Blue Sky Network 100115 C 1000A Iridium Satellite Phone System Page 33 ...
Page 38: ...Page 34 C 1000A Iridium Satellite Phone System 100115 ...
Page 43: ...December 2006 Blue Sky Network 100115 C 1000A Iridium Satellite Phone System Page 39 ...
Page 44: ...Page 40 C 1000A Iridium Satellite Phone System 100115 ...
Page 45: ...December 2006 Blue Sky Network 100115 C 1000A Iridium Satellite Phone System Page 41 ...