1.4
Installation
1.4.1
Suggested installation requirements
-
Indoors with good ventilation.
-
No heaters or hot side equipment around the machine. Do not place in direct sunlight.
-
Absolutely requires a sufficient water supply, well equipped drainage system, and close proximity to
power outlet.
-
Ice machine should not have any obstructions near the machine to promote and maintain proper air
flow and optimum ice production.
1.4.2
Installation check list
-
Are the front edges of modular head and ice storage bin level and in alignment?
-
Is the air vent pipe for the machine and drain line for ice storage bin separated?
-
Is there an air gap at the end of the drain pipe of the ice storage bin?
-
Have the modular head and ice storage bin, been checked and cleaned after installation?
-
Is the drain pipe easily disconnected from the modular head?
-
Is there 8
”
(200mm) minimum clearance around the ice machine?
1.4.3
Required environmental condition
Contents
Model
Available Range
Ambient
Temperature
All
7-38
℃
45-100
℉
Water
Temperature
All
7-32
℃
45-90
℉
Water
Pressure
All
30-100psig
2-7kg/
㎠
Voltage
115V
104-127V
208-230V
187-264V
220-240V
198-254V
Summary of Contents for BLMI-300A
Page 1: ...SERVICE MANUAL BLMI 300A BLMI 500A BLMI 650A BLMI 900A Ver200626 ...
Page 35: ...4 Circuit diagrams and technical data 4 1 Circuit diagrams 4 1 1 BLMI 300A 115V 60Hz ...
Page 36: ...4 1 2 BLMI 500A 115V 60Hz ...
Page 37: ...4 1 3 BLMI 650A 208 230V 60Hz ...
Page 38: ...4 1 4 BLMI 900A 208 230V 60Hz ...