background image

Do Not Duplicate, Alter, or Copy without the Express Written Consent  

of  BlueSky Mast, Inc.  Copyright 2015 BlueSky Mast, Inc.  All Rights Reserved   

 

AL2 Lift Series

 

Quick Reference Sheet 

-

 Primary and Secondary Guying

 

DEPLOYMENT

 

support@blueskymast.com

 

Read Manual Before Use 

Refer to detailed instructions in the 

AL2 Lift Series Manual at all times 

 

Drive two tripod stakes through two of the holes in the lift base plate. 

 

Person #2 should go to the guy rope that is 90 degrees from person #1. 
This will allow you to see how far each guy rope needs to be adjusted to 

get the mast straight. Rotate to the other guy ropes to finish adjustment. 

It may take a couple rotations to 
get  the  mast  straight  and  per-

pendicular. 

Adjust the 4 Primary Guy Ropes 

2 ppl. 

If the mast is leaning, Person #1 
should go to the guy rope oppo-

site the way the mast is leaning. 

Lock the primary guy ropes by pulling a small amount of slack in. Use 
your finger and  loop the guy rope over the front lip of the guy handle. 

Pull the guy handle towards the mast to remove any slack in the rope. 

52

 

53

 

75

 

55

 

56

 

57

 

58

 

 

Confirm all 4 secondary guy ropes are at a 45 degree angle between the 

primary guy ropes. Pull each of the secondary guy ropes out to it’s fullest 

distance, drive a stake into the ground and clip the guy rope to the stake. 

60

 

Adjust, lock and secure the secondary guy ropes. Pull a small amount of slack in the rope and wrap it over the 
rope lock on the front of the guy handle. Repeat this process until all 4 primary guy ropes have been adjusted 

and locked. 

Secure  the  4  secondary  guy 
ropes at this time. 

 

OPTIONAL: 

Secure the winch and winch cable by removing the ball stop from the ball stop holder. Wind the free 

cable onto the winch and secure the ball stop on the winch. Remove the handle and place it back into the wheeling 

carry bag or hard case. 

54

 

59

 

61

 

Reviews: