15
PERFORMANCE CHECKLIST
This checklist has been developed to assure proper installation of your appliance.
To validate your warranty you must mail or submit online this form within 90 days of installation and a copy of your
receipt to: Warranty Department, Prizer-Painter Stove Works Inc., 318 June Avenue Blandon, PA 19510 or
www.bluestarcooking.com/support/product-registration/.
Customer Information (Please Print)
Product Information (Please Print)
Name:________________________________________
Model No: ________________________________
Address: ______________________________________
Serial No: _________________________________
City: _________________________________________
Purchase Date: _____________________________
State, Zip Code: ________________________________
Installation Date: ___________________________
e-mail: _______________________________________
Installer’s Name: ___________________________
Telephone: ____________________________________
Company: _________________________________
Dealer: _______________________________________
Telephone: ________________________________
CHECK ALL THAT APPLY
Appearance and Aesthetics
Electrical Connection
Exterior
Correct voltage
Top section
Grounded outlet
Polarized outlet
No GFCI
Installation
Gas Connection
Proximity to cabinets
Verify fuel—_____Nat _____LP
Level
Gas shut-off present and accessible
Backguard in place
Supply line properly sized
Ventilation system
Supply pressure checked
Read User Manual
Operating pressure checked
Review safety instructions
All connections checked for leaks
Ignition
Flame Adjustment
Air/Gas Mixture
Valve Operation
Top Burners
Top Burners
Top Burners
Top Burners
Griddle
Griddle
Griddle
Griddle
Char Broiler
Char Broiler
Char Broiler
Char Broiler
Controls
Burner knobs
Thermostats