03
Just Power On
2.1. Installation (for grid-tie system)
ٴ
Before touching any conductor surface or terminal, measure the voltage of
WKHFRQWDFWSRLQWWRFRQrUPWKDWWKHUHLVQRGDQJHURIHOHFWULFVKRFN
ٴ
After the equipment is installed, empty packaging materials such as cartons,
foam, plastic, cable ties, etc. should be removed from the equipment area.
ٴ ([FHSWIRUWKRVHZKRRSHUDWHWKHHTXLSPHQWSOHDVHNHHSRWKHUVDZD\IURP
operating AC300.
ٴ
The handling of any tools being used needs to be insulated and protected
from shock, or use insulated tools.
ٴ
$OOZLULQJKROHVQHHGWREHVHDOHG8VHrUHUHVLVWDQWPXGWRVHDOWKHZLULQJ
holes that have been routed and use the cover of the cabinet.
ٴ
It is strictly forbidden to alter, damage or obscure the logo and nameplate on
the equipment.
ٴ
When installing the device, please use the appropriate tools to tighten any
screws.
ٴ
Live operation is strictly prohibited during installation.
ٴ
Paint scratches during equipment transportation and installation must be
UHSDLUHGLQDWLPHO\PDQQHU/RQJWHUPVFUDWFKHVDUHVWULFWO\SURKLELWHGDQG
may cause damage.
ٴ
Before operation, the equipment should be secured onto a floor or other
VWDEOHREMHFWVVXFKDVZDOOVRUSRVVLEO\PRXQWLQJEUDFNHWVLIQHHGHG
ٴ
It is prohibited to clean any electrical components inside and outside the
cabinet with water.
ٴ
Do not change or modify the structure, installation sequence, etc. of the
equipment without prior authorization.
2.1.1. Personal Safety
ٴ 'XULQJWKHRSHUDWLRQRIWKHHTXLSPHQWLIDPDOIXQFWLRQWKDWPD\FDXVH
SHUVRQDO LQMXU\ RU HTXLSPHQW GDPDJH LV IRXQG LW VKRXOG EH SRZHUHG RII
immediately.
ٴ'2127SRZHURQWKHGHYLFHLIWKHGHYLFHKDVQRWEHHQSURSHUO\LQVWDOOHGRU
FRQrUPHGE\DOOUHOHYDQWSHUVRQQHO
2.1.2. Personnel Requirements
ٴ
The personnel responsible for the installation and maintenance of the
equipment must first undergo rigorous training to understand various safety