System Installation of Evaluation Kit
5
1.2
EVK of BX2400-eRF01e-G10
This EVK is applicable to RF01. Items (1) to (11) will be introduced as below.
(1)
RF01, QFN52, 6*6mm
(2)
External Antenna Mount
(3)
Power Supply 3.3V LDO
(4)
Jumper Terminal
A.
Separate VDD_BAT and LDO. If unplugged, VDD_BAT and 3.3V LDO are disconnected,
using for checking overall power consumption current.
(5)
Battery Terminal
A.
VDD_BAT on the left, GND on the right.
B.
Should be in alliance with items#4. When connected #4, battery supplies RF01 through
LDO. When not connected, battery supplies RF01 directly.
(6)
IO External Connector: pinout as below
Summary of Contents for BX2400-dRF0xp-S1c
Page 15: ...System Installation of Evaluation Kit 15 5 Wait for installing 6 Click Finish to complete ...
Page 27: ...System Installation of Evaluation Kit 27 G RTT Log as below ...
Page 29: ...29 6 Appendix 6 1 Schematic of BX2400 dRF0xp S1c ...