SFU-0302 SSE
M a n u a l
– 14–
BMR GmbH
2014-03-17
E
7. Functions, Commissioning, Operation
3 operational possibilities:
•
Control and configuration manually via front keys
•
Automatic control and configuration via PLC / IPC
•
Automatic control and configuration via PC (RS232 interface)
7.1 Front
Panel
figure 2
The front keys allow access to following functions:
•
Start / Stop manually
•
RPM-control via UP / DOWN keys
•
Spindle
characteristic
selection
Button UP
Button DOWN
LCD 4-rows
Button START
Button STOP
Summary of Contents for SFU-0302-SSE
Page 1: ...Frequency Converter SFU 0302 SSE ...
Page 5: ...SFU 0302 SSE M a n u a l 5 BMR GmbH 2014 03 17 E 3 Block Diagram ...
Page 6: ...SFU 0302 SSE M a n u a l 6 BMR GmbH 2014 03 17 E ...
Page 28: ...SFU 0302 SSE M a n u a l 28 BMR GmbH 2014 03 17 E 13 Mechanics Views Dimensions ...
Page 29: ...SFU 0302 SSE M a n u a l 29 BMR GmbH 2014 03 17 E this page is left intentionally left blank ...