7
Work mode
7.4
Connecting delivery hoses
84
1.
Connect the delivery hose (1) to the outlet (2) of the mixing and delivery
vessel.
Figure 39: Connecting the delivery hose
2.
Lay the delivery hoses (1) as straight as possible and with as few hose
connections as possible.
3.
Connect the individual delivery hoses
Figure 40: Establishing hose connections
For hose connections, make sure that the rubber seals in the coupling
sleeves are clean and present.
To make a hose connection, open the two levers (3) (folding out), insert
the plug (5) into the socket (4) and close the two levers (3) on the
socket (folding in). The lock is secure.
➢
When laying through rooms with passenger or building material
traffic, it is advisable to additionally secure the levers against
unintentional folding out. This can be secured, for example, by a
wire sling around the levers.
Summary of Contents for alpha CR
Page 6: ...Contents ...
Page 180: ...14 Appendix 14 1 Declaration of conformity 180 14 1 Declaration of conformity ...
Page 181: ...Appendix 14 Drawings 14 2 181 14 2 Drawings 14 2 1 BMS alpha CR standard ...
Page 182: ...14 Appendix 14 2 Drawings 182 14 2 2 BMS alpha CR B feeder ...
Page 183: ...Appendix 14 Drawings 14 2 183 14 2 3 BMS alpha CR B S feeder scraper ...
Page 185: ...Appendix 14 Circuit diagrams 14 3 185 ...
Page 186: ...14 Appendix 14 3 Circuit diagrams 186 ...