Work mode
7
Connecting delivery hoses
7.4
85
4.
Secure the hose line with axle stands.
➢
To ensure that the material is transported quickly and safely on
level ground, lay the hose line shortly behind the machine using a
secured support stand. For longer, level hose lines, place a stand
under the hose line approx. every 20 metres. Ensure that the
support stand is securely connected to the ground so that it also
serves to secure the hose line.
5.
Mount a discharge stand (6) at the end of the hose line (1).
Figure 41: Mounting the discharge stand
Summary of Contents for alpha CR
Page 6: ...Contents ...
Page 180: ...14 Appendix 14 1 Declaration of conformity 180 14 1 Declaration of conformity ...
Page 181: ...Appendix 14 Drawings 14 2 181 14 2 Drawings 14 2 1 BMS alpha CR standard ...
Page 182: ...14 Appendix 14 2 Drawings 182 14 2 2 BMS alpha CR B feeder ...
Page 183: ...Appendix 14 Drawings 14 2 183 14 2 3 BMS alpha CR B S feeder scraper ...
Page 185: ...Appendix 14 Circuit diagrams 14 3 185 ...
Page 186: ...14 Appendix 14 3 Circuit diagrams 186 ...