Work mode
7
Operation in working mode
7.7
99
7.
Fill the mixing and delivery vessel to half its capacity and then swivel
the feeder down again using the "Raise/lower feeder" lever.
8.
Add the required quantity of binder and aggregates according to the
finished product requirement via the hopper.
9.
Add the required water quantity to the mixing and delivery vessel (1).
10. Swivel the feeder upwards again via the "Raise/lower feeder" lever.
11. Fill the mixing and delivery vessel (1) with the remaining sand and
gravel up to the lower edge of the filling dome.
12. Swing the feeder down again using the "Raise/lower feeder" lever.
➢
The feeder can be refilled during the mixing and delivery time.
13. Check the consistency and top up with water if necessary.
14. Fold the hopper (4) back and clean the edge of the dome.
15. Close the dome cover (see Section 7.7.2).
Summary of Contents for alpha CR
Page 6: ...Contents ...
Page 180: ...14 Appendix 14 1 Declaration of conformity 180 14 1 Declaration of conformity ...
Page 181: ...Appendix 14 Drawings 14 2 181 14 2 Drawings 14 2 1 BMS alpha CR standard ...
Page 182: ...14 Appendix 14 2 Drawings 182 14 2 2 BMS alpha CR B feeder ...
Page 183: ...Appendix 14 Drawings 14 2 183 14 2 3 BMS alpha CR B S feeder scraper ...
Page 185: ...Appendix 14 Circuit diagrams 14 3 185 ...
Page 186: ...14 Appendix 14 3 Circuit diagrams 186 ...