Storage
11
Personnel 11.1
165
11
Storage
11.1 Personnel
Target groups: O, F, S
Target group definition see Chapter 1.11, page 14.
11.2 Personal protective equipment
11.3 Storing the machine
Have all necessary maintenance work carried out by
BMS
or a specialist
workshop authorized by
BMS
before storing the unit.
If the machine is stored, it must be adequately protected against dust and
dirt. It must be stored in a frost-free, clean, dry room. The following must be
observed here:
−
Clean the
BMS
alpha
CR
thoroughly.
−
Cover the tyres and check the tyre pressure at regular intervals.
−
Ensure sufficient ventilation at the storage location.
−
Store the machine in a dry and clean place.
−
Check the operating supplies levels. Top up with the appropriate
operating supplies if necessary.
−
The storage period should not exceed approx. 3 months.
Summary of Contents for alpha CR
Page 6: ...Contents ...
Page 180: ...14 Appendix 14 1 Declaration of conformity 180 14 1 Declaration of conformity ...
Page 181: ...Appendix 14 Drawings 14 2 181 14 2 Drawings 14 2 1 BMS alpha CR standard ...
Page 182: ...14 Appendix 14 2 Drawings 182 14 2 2 BMS alpha CR B feeder ...
Page 183: ...Appendix 14 Drawings 14 2 183 14 2 3 BMS alpha CR B S feeder scraper ...
Page 185: ...Appendix 14 Circuit diagrams 14 3 185 ...
Page 186: ...14 Appendix 14 3 Circuit diagrams 186 ...