12
D
US
F
E
96547-10.2021-Us
Fig. 6
As short as
possible
Rigid
fixed point
4
|
Compressor assembly
A rule of thumb:
Always lay the first pipe section starting from the shut-off valve
downwards and
parallel to the drive shaft.
a) For HG44e a intermediate flange (height 27 mm) is optional available,
Art-Nr. 81194.
With this intermediate flange it is possible to lay the pressure line directly from
the valve to the left or right.
4.6 Operating the shut-off valves
Before opening or closing the shut-off valve, release the valve spindle seal by approx. ¼ of a turn
counter-clockwise.
After activating the shut-off valve, re-tighten the adjustable valve spindle seal clockwise.
Fig. 7
Fig. 8
Valve spindle seal
Release
Tighten
a)