9
Assembly Instructions
Step 1
(Preparations)
Unscrew the lid � Then remove the device
carrier from the housing �
Step 2
Before pouring the screed, a polystyrene
block (PB) with a circumference of approx�
40 mm larger than the box in its outer
dimension
*
must be glued to the insulation
layer (P) as a placeholder� Then lay the
conduits (L) and fix them (e� g� with adhesive
tape) vertically to the polystyrene block (PB)�
P
PB
L
40 mm
40 mm
Floor socket
40 mm
40 mm
View from above
PB