Start at high pulley station by inserting the
Metal Ball End here.
8
17
Lat Pulldown
Cable
Selector Rod Top Bolt (70) must be threaded a minumum of
1/2” into the Selector Rod (20), and Jam Nut (73) tightened
securely against spring lock washer (72) to ensure proper
connection. Check the Jam Nut (73) once a week to make
sure it is tight.
Diagram 1
Cable Installation
Diagram 2
Pulley Installation
WA R N I N G
!
!
Diagram 1A
S T E P
3 1/2” diameter
pulley
3 1/2” diameter pulley
Summary of Contents for G1S
Page 1: ...by Body Solid A s s e m b l y I n s t r u c t i o n s ...
Page 3: ...1 3 S T E P ...
Page 5: ...2 5 S T E P ...
Page 7: ...3 7 S T E P ...
Page 9: ...4 9 S T E P ...
Page 11: ...5 11 S T E P ...
Page 13: ...6 13 S T E P ...
Page 15: ...7 15 S T E P ...
Page 30: ...30 ...