Lat Pulldown Cable (36)
A.
Start at the front of the gym. Insert metal ball end of the Lat Pulldown Cable (36) into Top
Main Frame (G), through the frame and out through the second opening. Pull entire length
of Cable (36) all the way through. Install Pulley (A1) into the first opening, and Pulley (A2)
into the second opening. Be sure that Cable (36) rides on top of these pulleys. Install each
pulley using:
One 73 (3/8”x 2 3/4” hex head bolt)
Two 10 (pulley spacer)
One 91 (3/8” nylon lock nut)
B.
Remove Pulley (A3), route Cable (36) inside pulley housing as shown, and re-install
Pulley (A3).
C.
Remove Pulley (A4), route Cable (36) around Pulley (A4) as shown, and re-install Pulley (A4).
D.
Remove Pulley (A5), route Cable (36) inside pulley housing as shown, and reinstall
Pulley (A5).
E.
Route Cable (36) over Pulley (A6). Route Cable (36) down through opening in the small arm
sticking out of the Front Vertical Frame (F). Pull entire length of Cable (36) through.
F.
Route Cable (36) throught the Double Pulley Holder (130) as shown and install Pulley (A7)
using:
One 76 (3/8”x 1 3/4” hex head bolt)
Two 94 (3/8” washer)
One 91 (3/8” nylon lock nut)
G.
Route Cable (36) up and over Pulley (A8)* and then down toward weight stack.
*Note:
Leave the bolt going through Pulley (A8) hand tight until the end of Cable
Adjustments in Step 21.
H.
Remove Bolt (56) from Selector Rod Top Bolt (52), slide Cable (36) through Selector Rod Top
Bolt (52). Attach Cable End Shaft (135) and tighten Allen Screw (136).
Pull Cable (36) tight, so Cable End Shaft (135) fits inside Selector Rod Top Bolt (52).
Reinstall Bolt (56) in Selector Rod Top Bolt (52).
15
Be careful to assemble all components
in the sequence they are presented.
S T E P
mm
Inch
NOTE:
All pulleys are the 4 1/4” diameter Pulleys (26), except where noted.
38
4170 mm
13’ 8”
Ball Stop End
Metal Ball End
Summary of Contents for G9U
Page 43: ...STEP 16 41 92 4 37 2 84 4 A B1 43 43 B2 130 40 Short Cable 37 Leg Extension Cable N 14 ...
Page 45: ...STEP 17 43 C2 C1 AQ AL G E 131 C3 Pec Dec Cable 38 ...
Page 47: ...39 STEP 18 45 E C3 43 10 91 D2 132 10 73 AX 131 Ab Crunch Cable 27 D1 ...
Page 51: ...STEP 20 49 133 E6 F5 F4 BB 43 34 Leg Press Cable 1 F3 F1 BD ...
Page 67: ...mm Inch s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 99 ...
Page 68: ...Inch mm s h o w n i n a c t u a l s i z e G 9 U H A R D W A R E 100 ...