background image

P/N: 691106

USER KIT LAYOUT

Now you’re all set to enjoy your new Bodyguard

®

 V6X-V9X bike.

If you have any questions, don’t hesitate to contact your nearest Bodyguard

®

 dealer. 

Don’t forget to fill out your Bodyguard

®

 warranty card.  

You can also do it online at: 

www.bodyguardfitness.com

PLEASE NOTE: Be sure to read the Owner’s Manual before using your new bike.

Images are for illustrative purposes only and may change without notice.

Setup Guide

Setup Guide 

V6X–V9X

bodyguard

fitness.com

9095, 25th Avenue, St-Georges 

Quebec  G6A 1A1 Canada

Telephone: 418-228-8934

North America: 1-800-373-2639

Fax: 418-227-8120

13mm wrench

Phillips Screwdriver

SETTING UP YOUR STATIONARY BIKE

Every bike is delivered in a protective cardboard box.  Remove all the packaging and choose a location 

that provides enough space around the bike for you to work comfortably.

In the box, you will find the parts you need to put the bike together.  

You will also need a 13 mm flat wrench and a Phillips screwdriver, as shown.

Please note that your stationery bike has two transport wheels at the front of the  machine.  

Do not place or roll the machine on a rough uneven surface as this may damage the wheels.

STEP 2

Pull the two cables wound up inside the handlebar to the 

upper end of the front mast to connect them to the console.

Install the handlebar on the front mast using the four  

No. 7 screws and the No. 6 hex key.

STEP 4

The last step involves installing the seatpost.

Pull the adjustment handle and insert the seatpost 

into the main frame. Use the two No. 9 screws and 

a Phillips screwdriver to finish the installation of the 

plastic ring around the seatpost.

STEP 1

Begin your setup by installing the leg levelers No. 20 under 

your machine.

Connect the cables coiled up inside the front masts.

Fit the upper mast into the lower mast and secure with the 

six No. 4 screws and the six No. 5 washers. You will need a 

13 mm wrench.

STEP 3

You now have to install the console. You have four 

cable connections to do. Then install the console on 

the front frame using the four No. 8 screws and the 

No. 6 hex key.

N

o.

 4

N

o.

 5

N

o.

 6

N

o.

 20

Front Upper 

Mast

Contact Heart Rate

Heart Rate Radio Receiver

Communication Cable

Front Lower Mast

Leg Levelers 

(Step 1)

STEP 1

TOOlS

N

o.

 9

STEP 4

N

o.

 7

STEP 2

N

o.

 8

STEP 3

Reviews: