8.
Assemble Pedal(L&R) (#115,116) to left and right Pedal Assembly (#93,94) with Screw (#138).
ASSEMBLY INSTRUCTIONS
Á ³
¥ À
½ Õ
¾ ã
¸ }
¹ Ô
Nut
Adjust foot pad
9.
Adjust frame’s level, let middle adjustment foot pad higher to the frame hang in the air. Then adjust
rear adjustment foot pad of the frame to let frame be level and adjust middle adjustment foot pad to floor.
and tighten with (142)adjustment foot pad.
10.
Assembly the Grab handle cover(117,118,119,120) on the Handle assembly(102,103) with
3
Summary of Contents for EXT600
Page 1: ......
Page 3: ...2...
Page 5: ...1...
Page 14: ......
Page 15: ......
Page 21: ...P4 P5 P6 P7 P8 P9 P10 P11 P12...
Page 22: ...3 H R C 55 75 90 Tag HRC 55 HRC 75 HRC 90 HRC Tag...
Page 23: ......