Installation
3.5
Commissioning
Page 36
BOGE Operating instructions for C 15 series screw compressors
Checking for leaks
Undertake the following to prevent leaks:
–
Check screw connection of the lines and retighten, if necessary.
–
Check to ensure that the oil filter and oil separator are hand tight seated.
Conducting trial run
Close mains disconnecting device.
–
Switch on the compressor using the ON key. The compressor starts.
–
When the factory-set switch-off pressure is reached, the compressor cuts
off automatically.
–
Check network pressure on control display.
If necessary, reset operating pressure (pressure target value).
–
The compressor is ready for operation.
Switch off the compressor after a trial run of several hours under maximum
load.
List up the test results in the commissioning certificate.
Commissioning
following extended
stoppages
If an extended stoppage is scheduled, you should contact BOGE-Service be-
forehand.
Following an extended stoppage of more than two months, fill a small amount
of oil in the suction controller prior to starting the compressor.
WARNING: Risk of injury!
In case of leakages in the oil circuit there is a certain danger to slip and fall
because of oil spills!
Have all connections of the oil circuit checked for leakages by authorized
qualified personnel!
During the inspection slip-resistant safety shoes and protective clothing are
obligatory!
WARNING!
Only fill the suction controller with the grade of oil used to operate the com-
pressor.
Never mix different oil grades and brands.
WARNING: Risk of injury!
Prior to any maintenance and servicing work take all necessary safety pre-
cautions as described on page 5.