Installation
3.1
Transport and storage
Page 24
BOGE Operating instructions for C 15 series screw compressors
Crane transport
Fig. 3.2: Crane transport
Intermediate storage
In case the compressor is not installed immediately after delivery, it has to be
stored at a sheltered location. It must be ensured that during the intermediate
storage neither dust nor humidity can penetrate.
WARNING!
Inappropriate transport may lead to compressor damages. Do not subject the
safety cladding to force during transport.
–
Protect the compressor using wooden spacers (see arrows in the follow-
ing illustration).
–
Remove transport timbers.
–
Only use suitable transport slings having a minimum length of approx.
120 inches!
Position the slings at the ends underneath
the base frame of the compressor.
Neither
fasten the transport slings to the
suction filter
nor
to the eyelet on the motor.
NOTICE!
In case of an intermediate storage please observe the specifications and di-
rections as to permissible environmental impacts (see chapter „3.2 Com-
pressor room: Installation conditions for separately arranged compressed air
receivers“).
In case of a careless storage we assume no liability for consequent dam-
ages!
In the event of an extended intermediate storage or after an extended stand-
still (six months) you should consult BOGE-Service.
Please observe the directions for commissioning after an extended standstill
(see chapter „3.5 Commissioning“) if the intermediate storage takes longer
than two months.