Orion ISS
www.bolid.com
42
S2000-K Testing Procedure
For testing operability of the S2000-K, wire the keypad as shown in Figure 14. Two resistors of 220 Ω
and 0.125 W, R1 and R2, shall be brought between the S2000/S2000M console and the S2000-K
keypad as shown in the diagram in order to introduce damping into the communication line between
the devices.
The keypad pre-operation time doesn’t exceed three seconds.
1. Establish the test set-up as shown in Figure 14, not connecting wires of the RS-485 bus to
terminal blocks of the S2000(M) console. Set the keypad power supply voltage equal to (10.2
± 0.3) V.
2. Turn the S2000-K power supply on. The keypad sounder shall make a beep. The keypad LCD
and keys shall backlight. The keypad LED shall flash once per a second, the keypad LCD dis-
playing NO RS485 LINE.
3. Press any key on the keypad. A beep shall follow pressing the key.
4. Connect wires of the RS-485 interface bus to the terminal blocks of the S2000/S2000M con-
sole. The console shall indicate having found the device with the current address of the
S2000-K followed by resetting this device within a minute.
5. Press the keypad tamper switch and keep it pressed for at least 15 s; then release this one.
The S2000(M) console shall receive a tamper alarm from the keypad. Then press the keypad
tamper switch once more and hold it until the console receives a tamper restored notification
from the keypad.
6. Measure the current consumed by the S2000-K. The value shall not exceed 80 мА.
7. Set the keypad input voltage to 28 V. Repeat the test from the Step 2. The measured current
consumed by the S2000-K shall not exceed 30 мА.
8. Write the results of the inspection of the S2000-K into a keypad maintenance log book.
Summary of Contents for S2000-K
Page 1: ...Orion ISS KEYPAD S2000 K User s Manual ...
Page 4: ...Orion ISS www bolid com 4 ...
Page 5: ...S2000 К Features and Design 5 www bolid com FEATURES AND DESIGN ...
Page 8: ...Orion ISS www bolid com 8 ...
Page 10: ...Orion ISS www bolid com 10 ...
Page 11: ...S2000 К Operating 11 www bolid com OPERATING ...
Page 22: ...Orion ISS www bolid com 22 ...
Page 23: ...S2000 К Installation 23 www bolid com INSTALLATION ...
Page 27: ...S2000 К Programming 27 www bolid com PROGRAMMING ...
Page 36: ...Orion ISS www bolid com 36 Figure 8 Figure 9 ...
Page 41: ...S2000 К Maintenance 41 www bolid com MAINTENANCE ...
Page 45: ...S2000 К 9 www bolid com Appendix System Events Displayed by the Keypad LCD ...
Page 48: ......