Maintenance
BOMAG
35
BPH 80/65
4.5
Maintenance chart
With all maintenance intervals perform also
the work for preceeding shorter intervals.
Pos.
Description
Note
Maintenance every day
4.6
Check the fuel level
4.7
Check the engine oil level
4.8
Check the hydraulic oil level
4.9
Check the air filter service indicator
4.10
Check the water separator
Maintenance every month
4.11
Check the condition of the battery, grease the poles
4.12
Clean the dry air filter
Maintenance every 6 months
4.13
Change the engine oil
4.14
Change the engine oil filter
4.15
Check, adjust the valve clearance
4.16
Clean cooling fins and cooling air intake opening
4.17
Check the oil level in the vibrator housing
4.18
Change the dry air filter
Dim. mm (inch)
4.19
Change the fuel filter
4.20
Change the oil in the vibrator housing
4.21
Change the hydraulic oil filter
4.22
Check the rubber buffers
As required
4.23
Retighten the bolted connections Check the machine
visually
Summary of Contents for BPH 80/65
Page 2: ......
Page 6: ...Table of Contents BOMAG 6 BPH 80 65 ...
Page 7: ...BOMAG 7 BPH 80 65 1 Technical Data ...
Page 11: ...BOMAG 11 BPH 80 65 2 Safety regulations ...
Page 16: ...Safety regulations BOMAG 16 BPH 80 65 ...
Page 17: ...BOMAG 17 BPH 80 65 3 Operation ...
Page 28: ...Operation BOMAG 28 BPH 80 65 ...
Page 29: ...BOMAG 29 BPH 80 65 4 Maintenance ...
Page 53: ...BOMAG 53 BPH 80 65 5 Trouble shooting ...
Page 57: ......
Page 58: ......