Maintenance
BOMAG
34
BPH 80/65
4.4
Running-in instructions
For the start-up of new machines of over-
hauled engines the following maintenance
work must be performed:
!
Caution
During the running-in period up to approx. 200
operating hours check the engine oil level two
times every day.
Depending on the engine load the oil con-
sumption will drop to its normal level after a
running time of approx. 100 to 200 operating
hours.
After 25 operating hours
l
Change the engine oil.
l
Check engine and machine for leaks.
l
Check the valve clearance, adjust if neces-
sary.
l
Check the oil level in the vibrator shaft hous-
ing.
l
Check the hydraulic oil level.
l
Retighten the fastening screws for air filter, ex-
haust silencer, fuel tank and other attach-
ments.
l
Tighten the screw connections on the ma-
chine.
Summary of Contents for BPH 80/65
Page 2: ......
Page 6: ...Table of Contents BOMAG 6 BPH 80 65 ...
Page 7: ...BOMAG 7 BPH 80 65 1 Technical Data ...
Page 11: ...BOMAG 11 BPH 80 65 2 Safety regulations ...
Page 16: ...Safety regulations BOMAG 16 BPH 80 65 ...
Page 17: ...BOMAG 17 BPH 80 65 3 Operation ...
Page 28: ...Operation BOMAG 28 BPH 80 65 ...
Page 29: ...BOMAG 29 BPH 80 65 4 Maintenance ...
Page 53: ...BOMAG 53 BPH 80 65 5 Trouble shooting ...
Page 57: ......
Page 58: ......