I
NSTALLATION
,
O
PERATION
&
M
AINTENANCE
Introduction
INTRODUCTION
Please take the time to fully read this Installation manual. Failure to follow these instructions
may result in injury to you and damage to the air conditioner or your customer’s property.
Installation of this Bonaire Evaporative Air Conditioner must conform to local building rules
and regulations, electrical and plumbing codes, Environmental Protection Authority (EPA)
regulations, and all applicable Australian Standards.
Should you not follow these instructions the unit warranty may be void. The cost of warranty
would then be a cost to the customer or the installer / dealer.
Refer to the tick box Commissioning Checklist to ensure you have covered all points when
the installation is complete.
D
EALER
R
ESPONSIBILITY
Training
•
It is the responsibility of all dealers to adequately train their staff to ensure the
product is correctly sized and specified.
•
It is the responsibility of all dealers to ensure their installation teams / sub-
contractors are trained in the correct installation techniques of both the product and
the ducting.
•
Climate Technologies will provide technical assistance and training to the dealer /
installer. Ongoing training and professional development for staff and contractors is
the responsibility of the dealer.
Legal & Statutory obligations
•
It is the dealer / installer responsibility to comply with all codes, statutory and legal
requirements, state and council / shire by laws.
Safety and O.H.&S. Requirements
•
It is the responsibility of the dealer / installer to insure the environment is safe for the
installer to carry out the installation.
•
It is the responsibility of the dealer / installer to ensure safe access to the unit can be
achieved for service.
•
It is the responsibility of the dealer / installer to ensure the roof is provided with
access footings and platform where the pitch of the roof is greater than acceptable
standards
•
It is the responsibility of the dealer / installer to ensure tethered restraint anchor
points are provided. See Australian Standard 1891.4:2000 Part 4 Selection use and
maintenance, Table 2.1.
B
EFORE
C
OMMENCING
•
Packaging – check there is no damage before removing packaging.
•
Have you got all the system components?
•
Have you got the right unit?
•
Is the System Design Correct?
PDF ebook file resource Bonaire-Commercial-B-Series.pdf|Read online Bonaire-Commercial-B-Series.pdf|Where to download Bonaire-Commercial-B-Series.pdf|Read file Bonaire-Commercial-B-
Series.pdf
DOWNLOAD COMPLETE PDF FILE AT
http://certification.space/Bonaire-Commercial-B-Series.pdf