It is essential that water cannot enter the building as 
a result of inadequate sealing (caulking or flashing) of 
the fixings, the ductwork system, system pipes and 
wiring. 

All duct designs and airflows must be 
calculated by a qualified air conditioning 
consultant or contractor in accordance with 
normal good ducting practices. 

Discharge duct design critical to the air 
performance of the product.  See diagram 
below. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Where flexible ductwork is used, all bends 
must have a minimum radius of 1.5 times 
the diameter.  All joins must be taped 
airtight.  

The last bend to each ceiling register 
must be a smooth radius so that airflow is 
even into the room. 

 

 

 

PDF ebook file resource Bonaire-Commercial-B-Series.pdf|Read online Bonaire-Commercial-B-Series.pdf|Where to download Bonaire-Commercial-B-Series.pdf|Read file Bonaire-Commercial-B-

Series.pdf

DOWNLOAD COMPLETE PDF FILE AT

http://certification.space/Bonaire-Commercial-B-Series.pdf

Summary of Contents for B18

Page 1: ...ng as per the Bonaire Evaporative Air Conditioner service recording planner is carried out Failure to complete and record the periodic service work as outlined will void all guarantees beyond statutory and legal requirements PDF ebook file resource Bonaire Commercial B Series pdf Read online Bonaire Commercial B Series pdf Where to download Bonaire Commercial B Series pdf Read file Bonaire Commerc...

Page 2: ...____________________________ 12 Wiring Important Notes _________________________________________________ 12 Wiring Diagram_________________________________________________________ 13 COMMISSIONING_____________________________________________________ 16 Water Levels___________________________________________________________ 16 Bleed off Rate__________________________________________________________...

Page 3: ...installer Ongoing training and professional development for staff and contractors is the responsibility of the dealer Legal Statutory obligations It is the dealer installer responsibility to comply with all codes statutory and legal requirements state and council shire by laws Safety and O H S Requirements It is the responsibility of the dealer installer to insure the environment is safe for the i...

Page 4: ... and to applicable National Standards LOCATION AND ORIENTATION Check the proposed unit location first to ensure that it is structurally capable of supporting the weight of the unit A level stand is required which must be capable of supporting the operating weight of the unit including wind loading Check the technical data for operating weight The preferred location for an evaporative air condition...

Page 5: ...23 36 PDF ebook file resource Bonaire Commercial B Series pdf Read online Bonaire Commercial B Series pdf Where to download Bonaire Commercial B Series pdf Read file Bonaire Commercial B Series pdf DOWNLOAD COMPLETE PDF FILE AT http certification space Bonaire Commercial B Series pdf ...

Page 6: ... between the metal stand and the aluminium chassis 4 Always ensure the unit is level 5 Allow adequate access around the unit for maintenance Provision must be made for access to electricity water supply and drains High roofs need to be provided with permanent access to carry out maintenance or warranty work It is the owner s responsibility to provide safe access to the unit Climate Technologies ma...

Page 7: ...ischarge duct design critical to the air performance of the product See diagram below Where flexible ductwork is used all bends must have a minimum radius of 1 5 times the diameter All joins must be taped airtight The last bend to each ceiling register must be a smooth radius so that airflow is even into the room PDF ebook file resource Bonaire Commercial B Series pdf Read online Bonaire Commercia...

Reviews: