20
GENERAL COMMENTS
The Generator must be installed on a rigid, levelled base, preferably on a concrete slab, in a room which
ensures adequate access to all the equipment and for the personnel.
The boiler room must comply with the prevention standards in force and must be dry, clean and well ven-
tilated.
Good ventilation is essential to supply enough air for combustion and a temperature which is suitable for
the regular operation of the electrical equipment, in any case not higher than 35-40°C.
The boiler room must have at least two constantly open air inlets, one of which as close to the fan as pos-
sible.
The boiler room must be high enough for the coil to be taken out.
Connections to be made
Make the following connections to start the generator:
•
Chimney pipe to drain the fumes from the boiler outlet to the outside.
•
Steam piping at the distribution system.
•
Water piping at the water/condensation collection tank.
•
Humidity separator (if fitted) drainage piping.
•
Safety valve drainage piping.
•
Boiler drainage piping.
•
Fuel piping to the burner.
•
Electricity to the panel.
!
INSTALLATION OUTSIDE IS ABSOLUTELY FORBIDDEN, EVEN UNDER A ROOF
UNLESS THE GENERATOR HAS BEEN SPECIALLY MADE FOR THIS PURPOSE
!
DURING INSTALLATION ALWAYS MAKE THE HYDRAULIC CONNECTIONS FIRST
AND THEN THE ELECTRICAL CONNECTIONS.
7. INSTALLATION