The Main Switch and POWER LED, OVERLOAD (OVERHEAT) LED are located on the top of
the POWER LED will be on, the shredding process is started
the shredder may occur overheat, and the
OVERLOAD (OVERHEAT)
Indicator will be red e.g.
More than 4 minutes for computer paper without stopping.
ten (10) sheets at one pass, or if the paper is not fed squarely into the feed opening, and the
OVERLOAD (OVERHEAT)
Indicator will
be flashing.
C209-D ten(10)
C209-D
OVERLOAD (OVERHEAT)
4
the shredder
paper maximumly,
Summary of Contents for DocShred C209-D
Page 1: ...C209 D 10 Sheets Cross Cut...
Page 2: ...4...