BKS Terminal Disinfection Robot Product Manual v1.0
BooCax Robotics
8
/
24
www.boocax.com
2.
Assembly
Step 1
:
Unpack and check materials
The packaging of this product consists of two boxes, with the larger box for the chassis
and charging pile (
①
-
③)
, and the smaller box for the robot body(
④
-
⑧
). After unpacking,
check the materials and accessories against the Nos.1-8 in the figure below for any missing or
damage
(Package concludes two one-way nozzles, and two mist tubes).
Step 2
:
Install the Sprayer
①
Take out the chassis and place it
on the floor stably, make sure
that the lower charging mouth is
facing forward, pull out the two
connectors (Terminal 1: signal
wire, Terminal 2: power wire),
and visually find the four
positioning holes on the iron
plate
→
Terminal 2
Power Wire
Terminal 1
Signal Wire
①
Chassis
Charging Pile
Adapter, power cord
Sprayer base
Tank lid
Mist Tube
Tank
One-way nozzle
②
③
④
⑧
⑦
⑥
⑤