The wiggle wire should be secure on the top ends and
at the hip board all along the sides first. The EMT on
the roll up sides should be extending a foot past the
greenhouse on each end. You will just have to eye
this one out a bit, but it’s very simple.
There are different ways to secure the guide rail for the
hand crank, but the simplest is to take a scrap piece
of ½" or 1" EMT, about 3-4 ft, and hammered that into
the ground near the edge of the 3/4" EMT conduit. I
then put a 6 ft piece of EMT conduit about 2 ft down
into this pipe and put in 2 screws at ground level to
secure it.
Put your hand crank on the guide rail, slide in the ¾
″
conduit, drill a hole and use the included screws to
secure and you’re done!
Install Hand Crank for Roll-up Sidewalls
(Ventilation for your Hoop House)
36
Summary of Contents for DIY High Tunnel Plans
Page 33: ...Side Detail 33 ...