background image

Page 3

2  Introduction to the panel 

Rear panel descriptions

Tower

Battery box 

1. DC Breaker 

1.  Battery over-current protection breaker.

 

2.  To easy swappable battery, please put the position of the

  

  breaker in “O” position. In case there is 2

nd 

(or next) battery

  

  box connected with the battery box, the DC voltage from the

  

  UPS Bat.+/- will flow through without any interruption to

  

  the 2

nd

 battery box. 

2. UPS b/-     To the UPS DC connected. 
3. External b/-  To the DC connected of the 2

nd 

(or next) battery box 

    con/-   connected.

1

1

2

2
3

3

Summary of Contents for GALILEO UPS

Page 1: ...www borri it Battery box ...

Page 2: ......

Page 3: ...Page 1 Box batteria Borri Galileo UPS 1 Safety instructions 2 2 Introduction to the panel 3 3 Installation and operation 5 4 Battery box specification 8 Index page ...

Page 4: ...or this battery box will be void if water or other liquid is spilt or poured directly onto the battery box Similarly we do not warrant any damage to the battery box if foreign objects are deliberately or accidentally inserted into the battery box enclosure The battery will discharge naturally if the system is unused for a period of time It should be recharged every 2 3 months if unused If this is ...

Page 5: ...please put the position of the breaker in O position In case there is 2nd or next battery box connected with the battery box the DC voltage from the UPS Bat will flow through without any interruption to the 2nd battery box 2 UPS battery To the UPS DC connected 3 External battery To the DC connected of the 2nd or next battery box connector connected 1 1 2 2 3 3 ...

Page 6: ...e breaker in O position In case there is 2nd or next battery box connected with the battery box the DC voltage from the UPS Bat will flow through without any interruption to the 2nd Battery Box 2 UPS battery To the UPS DC terminal or the next battery box 3 External Battery To the DC terminal of the 2nd or next battery box connector connected ...

Page 7: ...n accordance with the battery box working specifications to avoid overheat and excessive moisture Do not place the battery box in a dusty or corrosive environment or near any flammable objects This battery box is not designed for outdoor use The packing condition and the external outlook of the unit must be inspected carefully before installation Retain the packing material for future use Unpackin...

Page 8: ...Page 6 Battery box Installation supports of Rack Tower units Installation instructions Tower Use with UPS ...

Page 9: ...x UPS Storage instructions For extended storage through moderate climate 15 C to 30 C 5 F to 86 F the batteries should be charged for 12 hours every 6 months by plugging the UPS power cord into the wall receptacle Repeat this every 3 months under high temperature 30 C to 45 C 86 F to 113 F environment ...

Page 10: ...Max UPS charge current Standard 2 2 A 1 4 A 1 A External charger 5 2 A 4 4 A 4 A Connector color Red Black Green Gnd Dimensions W x D x H mm Unit 144 x 367 x 236 151 x 444 x 322 151 x 444 x 322 Shipping 304 x 398 x 527 304 x 484 x 604 6 304 x 484 x 604 6 Weight kg Unit 14 7 39 0 39 0 Shipping 15 9 40 5 40 5 Battery box requires an external 250 W battery charger for charging the batteries cod MUPSA...

Page 11: ...nt Standard 1 5 A 1 A 1 A External charger 4 5 A 4 A 4 A Connector color Red Black Green Gnd Dimensions W x D x H mm Unit 440 x 650 x 88 440 x 650 x 88 440 x 650 x 88 Shipping 560 x 833 x 228 560 x 833 x 228 560 x 833 x 228 Weight kg Unit 28 6 28 6 37 4 Shipping 30 30 39 Battery box GALILEO RT specification Contact your local recycling or hazardous waste center for information on proper disposal o...

Page 12: ...Borri S p A Via 8 Marzo 2 52011 Bibbiena Arezzo Italy phone 39 0575 5351 fax 39 0575 561811 www borri it OML65026revB 07 2015 Battery box ...

Reviews: