Page 5
Battery box
3 Installation and operation
Installation position
It is necessary to select a proper environment to install the
unit, in order to minimize the possibility of damage to the
battery box and extend the life of the batteries.
Please follow the instructions below:
Keep at least 30cm (12 inches) clearance from the rear panel
of the battery box from the wall or other obstructions.
Do not block the air-flow to the ventilation openings of
the unit.
Please ensure the installation site environmental conditions
are in accordance with the battery box working specifications
to avoid overheat and excessive moisture.
Do not place the battery box in a dusty or corrosive
environment or near any flammable objects.
This battery box is not designed for outdoor use.
The packing condition and the external outlook of the unit must be
inspected carefully before installation.
Retain the packing material for future use.
Unpacking
Take the battery box out of the PE foam.
Remove the packing materials.
Note: The battery box module is approx. 12.2 ~ 50 kgs, be cautious when unpacking
and lifting the unit to avoid injury.
Standard package includes:
DC connect cable (C1 or C2)
Accessories for Tower Mount
Accessories for Rack/Tower A1~A2, B1~B2, S1~S3
1pcs
C1
C2
2pcs
Summary of Contents for GALILEO UPS
Page 1: ...www borri it Battery box ...
Page 2: ......