11
5. INSTALLATION
Please read and understand our general information before starting the instal-
lation.
Technical installation
In general, the LE300 can be installed in any mounting direction. Recommended
mounting directions are mounting in upright position using the standard lead
acid battery clamps and mounting flat on biggest area using direct mounting
to a mounting plate with screws/bolts. See graphics below for details.
Electronical installation
The LE300 Lithium Extension Battery is connected in parallel to the lead acid
battery. Please note that a standard lead acid battery charge controller is nee-
ded. No special additional charge controller is needed for the LE300. It is impor-
tant to choose the right size of connection cable, depending on the maximum
currents. Several sets of connecting cables might be required. Make sure that
wiring is done according to DIN VDE 0298-4.