48/64
Maintenance and repair
Bosch Rexroth AG
, Material and information fl ow technology: HQ 2/C-H, HQ 4, 3 842 358 792/2016-12
10.4.3
Replacing the transmission, internal motor mounting
Fig. 29:
1
551 261-27
M
D
=20 Nm
SW8
4x
1
A
Preparation and removing the motor
Please note:
To replace the transmission,
belt section BS 2/CH-HQ2,
BS 4/C-HQ4 for the
transverse conveyor of the
lift unit must be removed.
Required tools
• Hex socket wrench, size 3
• Hex socket wrench, size 4
• Hex wrench, size 8
• Hex wrench, size 10
• Hex wrench, size 13
Preliminary steps
Allow the belt section to
run briefl y and position
the fl at-top plate with hole
(A, chain coupling position)
on the drive sprocket.
Now deenergize and
depressurize the system,
and secure it against
being reactivated.
1.
Remove the motor.
551261_2016_12_EN.indd 48
551261_2016_12_EN.indd 48
22.12.2016 10:26:36
22.12.2016 10:26:36